PERMITTING
UMRWD permits are required for work such as installation of main tile, installation of seepage tile, cleaning ditches, creating new ditches, restoring and/or cleaning of waterways, installation or replacement of culverts and installation of pumps.  Other types of work may also require a permit.  If you have questions regarding the permitting process please refer to the Rules and Regulations at the left or contact our office.

Aerial photos with scale drawings of proposed projects are required to be submitted with the completed permit application.  Township section maps are available on the "Maps" page.

Please Note: Permit applications are to be recieved a minimum of five business days prior to the next board meeting for consideration at that meeting. If requesting a permit for installing tile, all tile sizes and lengths must be in included on the permit; applications that do not include tile size and length will not be considered for approval.